{"product_id":"hands-free-dog-leash-6-in-1-adjustable-design-for-waist-crossbody-traffic-and-long-lead-walking","title":"Hands-Free Dog Leash, 6-in-1 Adjustable Design for Waist, Crossbody, Traffic and Long-Lead Walking","description":"\u003cp\u003eThis 6-in-1 hands-free dog leash adapts to different walking styles without requiring you to switch leashes. Adjust it from 6 to 8 feet depending on how you wear it, then transition between a traditional hand-held leash, a waist leash, a crossbody leash, a short traffic leash, a long lead or a tether around a pole or tree.\u003c\/p\u003e\u003cp\u003eTwo adjustable D-rings help create a comfortable fit for different body sizes, while a silver snap hook at each end supports the leash’s convertible design. Its waterproof construction is suited to walks where moisture may be encountered, though the metal hardware should be dried afterward to help maintain its longevity.\u003c\/p\u003e\u003ch2\u003eKey Features\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003eSix wearing configurations: traditional handle, hands-free waist, hands-free crossbody, 3-foot traffic leash, adjustable 6–8-foot long lead and secure placement around a pole or tree.\u003c\/li\u003e\n\u003cli\u003eTwo silver snap hooks, with one positioned at each end for versatile attachment and adjustment.\u003c\/li\u003e\n\u003cli\u003eTwo adjustable D-rings allow the fit to be customized for different body types.\u003c\/li\u003e\n\u003cli\u003eTransitions between its supported configurations in seconds, keeping one leash ready for changing walking situations.\u003c\/li\u003e\n\u003cli\u003eOffered in Black, Blush, Chocolate, Lilac, Navy, Sky, Spruce and Tan, with LITE and Regular sizes for every listed color.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch2\u003eSpecifications\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003eProduct type: 6-in-1 hands-free dog leash.\u003c\/li\u003e\n\u003cli\u003eAdjustable length: 6–8 ft, depending on how the leash is worn.\u003c\/li\u003e\n\u003cli\u003eShort traffic configuration: 3 ft.\u003c\/li\u003e\n\u003cli\u003eHardware: two silver snap hooks, two adjustable D-rings and rivets.\u003c\/li\u003e\n\u003cli\u003eColors: Black, Blush, Chocolate, Lilac, Navy, Sky, Spruce and Tan.\u003c\/li\u003e\n\u003cli\u003eSizes: LITE and Regular.\u003c\/li\u003e\n\u003cli\u003eCare: After exposure to water or heavy moisture, dry the snap hooks, rivets and D-rings following each walk to maintain hardware longevity.\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eEnjoy greater flexibility on walks with one adjustable leash that moves easily between hand-held, hands-free, short-control and long-lead configurations.\u003c\/p\u003e","brand":"Parker \u0026 Co.","offers":[{"title":"Black \/ LITE","offer_id":50316973670503,"sku":"SHP-2236-4FCB12","price":85.94,"currency_code":"USD","in_stock":false},{"title":"Black \/ Regular","offer_id":50316973703271,"sku":"SHP-2236-4FDFB8","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Blush \/ LITE","offer_id":50316973736039,"sku":"SHP-2236-98AC3E","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Blush \/ Regular","offer_id":50316973768807,"sku":"SHP-2236-855E37","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Chocolate \/ LITE","offer_id":50316973801575,"sku":"SHP-2236-96431B","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Chocolate \/ Regular","offer_id":50316973834343,"sku":"SHP-2236-1B1EC9","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Lilac \/ LITE","offer_id":50316973867111,"sku":"SHP-2236-FDB69D","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Lilac \/ Regular","offer_id":50316973899879,"sku":"SHP-2236-B20CD7","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Navy \/ LITE","offer_id":50316973932647,"sku":"SHP-2236-D6CD82","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Navy \/ Regular","offer_id":50316973965415,"sku":"SHP-2236-DB9468","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Sky \/ LITE","offer_id":50316973998183,"sku":"SHP-2236-3C6642","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Sky \/ Regular","offer_id":50316974030951,"sku":"SHP-2236-F17EB2","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Spruce \/ LITE","offer_id":50316974063719,"sku":"SHP-2236-B82FBA","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Spruce \/ Regular","offer_id":50316974096487,"sku":"SHP-2236-F7F6AD","price":85.94,"currency_code":"USD","in_stock":true},{"title":"Tan \/ LITE","offer_id":50316974129255,"sku":"SHP-2236-52EB9F","price":85.94,"currency_code":"USD","in_stock":false},{"title":"Tan \/ Regular","offer_id":50316974162023,"sku":"SHP-2236-2C463F","price":85.94,"currency_code":"USD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0661\/6209\/8279\/files\/7761989632236-main-001.png?v=1790240155","url":"https:\/\/cozypawwear.com\/products\/hands-free-dog-leash-6-in-1-adjustable-design-for-waist-crossbody-traffic-and-long-lead-walking","provider":"CozyPaw Wear","version":"1.0","type":"link"}